Heritage Way Rangers’ summer inspections found the route generally in excellent condition. Volunteers dealt with fallen branches, vegetation, litter, minor erosion and missing waymarkers to keep the 55-mile trail clear and well signed.
Similar Posts
Partnership formed for Matlock to Matlock Bath
Author:Snippet PublisherMatlock Civic Association, Matlock Bath Development Association and the Derwent Valley Trust Cycleway Project have joined forces to seek funding for detailed design work on a traffic-free Matlock–Matlock Bath route. The scenic east-bank alignment must navigate river crossings, ancient woodland, a Site of Special Scientific Interest and the World Heritage Site.
Joseph Wright paintings of views from proposed path
Author:Original BuilderBack to news and articles ← The paintings can be viewed at Derby Museum Looking forward to seeing the same views from the cycleway as the project proceeds.
Heritage Way completed in under 17 hours
Author:Snippet PublisherTom Wright and Timothy Moffatt completed the full Derwent Valley Heritage Way in under 17 hours, raising money for the University of Sheffield’s student hardship fund. The Trust congratulates them on an exceptional end-to-end effort.
White Peak Loop link to boost Derwent Valley Trail
Author:Snippet PublisherDerbyshire County Council is assessing potential routes between Knowleston Place in Matlock and High Peak Junction in Cromford. The proposed walking, wheeling and cycling route would complete a key missing section of the White Peak Loop and form part of the proposed Derwent Valley Trail.
Four surface types selected for Belper West Bank
Author:Snippet PublisherWork on the Belper West Bank route identified four surface treatments suited to different conditions: tarmac, compacted earth, Grassmat and boardwalk. The mix reflects flood risk, tree-root protection, wildlife habitat and the character of the riverside setting.
Heritage Way diversion in Darley Abbey
Author:Ian DentBack to news and articles ← With the closure of the Darley Abbey Mills pedestrian and cycle bridge for safety reasons, it is no longer possible to follow the Heritage Way route through Darley Abbey village. Instead, it is necessary to follow a diversion using the east bank of the Derwent and to make use…
