• Skip to primary navigation
  • Skip to main content
  • Skip to footer

Derwent Valley Trust

Discover Derbyshire's Valley

  • Home
  • Walk
    • Buy the Guide
    • The whole route
    • Sections 1 – 4: Heatherdene to Matlock
    • Sections 5 – 7: Matlock to Little Eaton
    • Sections 8 – 10: Little Eaton to Derwent Mouth
    • River Derwent
    • Walk Videos
  • Cycle
    • Cycle Benefits
    • Frequently Asked Questions
  • Paddle
    • Current Situation
    • The Ambition
  • About us
    • Contact
    • Trustees
    • Origins
    • Fundraising and Donations
  • News
    • Newsletter

Ian Dent

On Yer Bike, Belper!

Fri 9 February 2024 By Ian Dent

An interesting event is planned for the afternoon of Saturday 16th March 2024 in Belper.

It is hoped that the Derwent Valley Trust will be attending the event to discuss progress and ideas regarding the Derwent Valley Cycleway

Put the date in the diary and we hope to see you in Belper.

More information from the organisers here

Filed Under: News, Uncategorized

World Water Day – 22nd March

Tue 21 March 2023 By Ian Dent

The 22nd March 2023 is World Water Day and has been selected to tie in with the UN Water Conference being held in New York on the 22-24th March.

The Day is about accelerating change to solve the water and sanitation crisis and asks for us all to make commitments to help meet the goals.

We’re privileged to have the Derwent Valley on our doorstep but many parts of the world are not so lucky. And, even in the beautiful Derwent Valley we could do with better quality water in the river.

Filed Under: News

Local Cycling and Walking Infrastructure Plan

Fri 3 March 2023 By Ian Dent

The Government has asked each Council across the country to create a Local Cycling and Walking Infrastructure Plan (LCWIP). This is an important document as it shows what the Council wish to achieve relating to Active Travel for the next 15 years.

For our area, the Councils for Derby City, Derbyshire, Nottingham and Nottinghamshire have worked together (under the banner of the Local Enterprise Partnership – D2N2 LEP) to create a single plan for the region.

As the Derwent Valley Trust we’re pleased to see the Plan progressing and support the goals of defining a long term plan for a well connected cycle network.

The LEP is now asking for feedback on the draft plan (deadline of 8th March 2023) – the LCWIP plan, supporting documents and maps, and the method of providing feedback can be found at https://lcwipeastmids.consultation.ai/ We’d encourage readers to submit their feedback on the benefits of the Plan together with any specific comments you may have.

The Derwent Valley Trust has submitted feedback as an organisation on the cycling aspects of the plan. The main points of this feedback are:

  • The need for the routes crossing between local authority boundaries to be considered as strategic routes from end to end and not be downgraded when passing from one authority’s area to another. In particular the portions of the Derwent Valley Cycleway in Derby City need to be shown as strategic routes to reflect their status in Derbyshire.
  • The method of assessing routes for commuting is based around an urban area and does not accurately reflect the demand for use of a cycleway within a geographically constrained corridor. The consideration of only commuting demand within 200 metres of a proposed route needs to be reconsidered to cater for commuting from a less urban area. In particular, the Derwent Valley Cycleway between Belper and Derby would provide benefits to all residents within the Derwent Valley including those over 200m from the route.
  • The time taken to complete the LCWIP (since work started in 2017) means that a review of the current plan is well overdue and work should begin now on version 2 of the LCWIP. The Derwent Valley Trust should be included as a key stakeholder in any work towards creating the next version of the Plan.
  • The analysis should include the available school travel data when assessing demand for any route.
  • The prioritisation process for Derbyshire routes reflects the process used for the Derbyshire Key Cycle Network. This assessed routes under an “environmental” heading and which penalised routes that are proposed to run through areas of particular natural or heritage value (e.g. nature reserves, heritage sites). While dealing with nature or heritage requirements may make the route harder to deliver, the benefits of the route are greatly increased by providing access to the special sites and this should be reflected by boosting rather than penalising the environmental rating (and its equivalent within the LCWIP process).
  • While the Derwent Valley Mills UNESCO World Heritage Site is acknowledged in the LCWIP, a greater degree of importance of the Site should be reflected in the analysis. The Site is one of only 20 World Heritage Sites in England, and the only one in the East Midlands, and there is a massive opportunity to use the LCWIP plans to allow tourism and other benefits of the Site to be accrued.

Filed Under: Cycle, News Tagged With: cycle

Darley Abbey to A38 – A Request

Tue 11 October 2022 By Ian Dent

The intricacies of planning procedures means that we need your help again.

You may recall that back in late 2020, planning applications for the Darley Abbey to A38 (Ford Lane) section of the Cycleway were submitted to both Derby City and Erewash Borough Councils. The southern part of the planned route falls within the City, the northern part within Erewash so permission from both planning authorities is needed.

The Derby City application is still to be finalised but a determination is expected soon. All feedback to the Council has been supportive of the plans. Commenting on this Derby City application closed a long while ago and no action is requested from you regarding this Derby City planning application.

For the Erewash section, discussions with landowners and further investigation has suggested a slight change to the most northern part of the route. Previously (and as part of the original planning application) the route was to run through an underpass of the A38 which is heavily used by Talbot Turf agricultural machinery. A much improved plan now follows the bank of the river more closely and passes under the A38 bridge alongside the Derwent before reaching Ford Lane.

The change of route means that the Erewash application has to be resubmitted with the original application being withdrawn and this has now happened.

One effect of this re-application is that all the letters of support previously sent to Erewash are now obsolete (and discarded) and we need to ask our supporters to please submit their support for the new, modified, planning application.

Full details of the new planning application can be found by visiting https://register.civicacx.co.uk/erewash/planning and searching for reference 0922/0067.

To submit comments online visit https://www.erewash.gov.uk/planning-section/planning-enquiry-form.html A few questions need to be answered:

  • Site address is “Cycleway from River Derwent borough boundary towards Ford Lane Little Eaton Derbyshire”
  • “Planning enquiry / Make a representation”: Select “make a representation”
  • Application reference is 0922/0067
  • Case Officer is Kerry Hallam
  • “Your views” – important to select “support” and comments can then be added at the next question.

While you can add whatever comments you wish, none are necessary and the key thing is to register your “support”. Some of the benefits you may wish to consider for your comments include:

  • Cost – covered by National Highways so a great opportunity for local benefit at no cost to the local Councils
  • Allows for an additional choice of commuting method from the North towards Derby when, and if, the A38 Junctions works (flyovers) start
  • Safety – allows for cyclist to avoid the accident black spot at Palm Court Island (A38/A6 junction) and provides a traffic free alternative route.
  • Links to the Darley Fields path for onward travel to Derby and provides the next part of the Derwent Valley Cycleway to continue to the north to eventually reach Chatsworth.
  • Will allow for replacement of poor parts of the existing National Cycle Network (NCN 54) currently on Alfreton Road (on road with no cycle facilities) and alongside the A61 (narrow in places and unprotected from fast motor traffic).
  • The route is a long standing goal within the Derby City Rights of Way improvement plan and the Erewash section is necessary for the Derby section to be useful.
  • The route will provide improved access for Darley Abbey pupils at Ecclesbourne school (particularly with the future addition of the Ford Lane to Duffield section of the Derwent Valley Cycleway).
  • Links partially to the planned Rewilded Allestree Park destination
  • Originally called for in the Derby Cycling Group 1983 plan for cycling improvements in and around Derby (produced in conjunction with the City Council) so well overdue
  • Local Ramblers groups have been consulted and are supportive of the plans

The Erewash application should be determined before the end of December 2022 so please submit your support and comments as soon as possible to ensure they are considered.

Thanks for your continuing support.

Filed Under: Cycle, News Tagged With: cycle

Darley Abbey bridge open

Fri 7 October 2022 By Ian Dent

The bridge across the Derwent from Darley Abbey to Darley Abbey Mills was suddenly closed earlier in the year when safety issues were identified. After a lot of confusion as to who was responsible for the bridge, Derby City Council undertook to provide a temporary replacement.

This temporary bridge (planned for 12 months usage) has now been opened and the link across the river restored.

The bridge is open to walkers, cyclists and users of mobility aids with signage encouraging all users to be considerate of others. The original bridge supported motor traffic which never really mixed well with the other types of users as the bridge and the route through the Mills was narrow. The replacement bridge is not open to motor traffic which has the knock on effect of making the route through the Mills more attractive as only motor traffic accessing the Mills (i.e. no through motor traffic) will be encountered by pedestrians and cyclists.

The bridge has been built above the existing, damaged bridge which means that ramps are needed on each bank.

The opening event was very well attended.

Well done to Derby City Council for funding the replacement bridge and for getting it in place as quickly as they have.

The bridge removes the gap in the Derwent Valley Heritage Way that the original closure caused. It also restores the missing link in the National Cycle Network (orbital route 66).

Filed Under: Cycle, News Tagged With: cycle

Guardian Newspaper features the Heritage Way

Thu 22 September 2022 By Ian Dent

This week’s Guardian newspaper features the experiences of one of their reporters walking the Heritage Way from Hathersage to Derby. Very positive so perhaps it will lead to many more walkers on the route over the coming weeks.

Great to see a holiday article about Derbyshire focusing on the World Heritage Site instead of the Peak District National Park although both are great.

Filed Under: News

« Previous Page
Next Page »

Footer

About the Trust

The Derwent Valley Trust was set up in 1996 to promote the history, arts, wildlife and leisure opportunities that surround the river Derwent along its 55 mile course through Derbyshire.

Read more about the Trust >>

Charity No. 1058609

See the walking route

Buy the guide on eBay


Buy now on eBay

Copyright Derwent Valley Trust© 2026 · Log in

Loading Comments...